CIE Technical Committee 8-10 |
|
Meetings |
|
· Date To Be Determined
|
|
· July 7, 2006—Instrumentation, UV measurement, questionnaire |

|
There is an archive of the TC email available at http://vivid.colour.org/cgi-bin/wa. |
|
· June 1, 2006—Introduction of members, discussion of Terms of Reference, Liaison issues, plan of work, pilot study |
|
· August 17, 2006—participation of instrument manufacturers, relevant material, measurement analysis, cross calibration, use of reference paper |
|
· September 6, 2006—plans for running the pilot test |
|
· October 24, 2006—Reference LED-based source, review of guidelines |
|
· November 8, Plan to simplify the pilot study |
|
· December 1, 2006—Time table for pilot study, Comments on guidelines |
|
· December 21, 2006—Results of testing with irradiance device, schedule updates |
|
· March 1, 2007—Brief meeting about data analysis |
|
· September 9, 2007—Measurement geometry and plans for recruiting help |
|
· October 10, 2007—Plans for continuing the experiment |
|
· November 8, 2007—Volunteers for the experiment |