CIE Technical Committee 8-10 |
|
Work Programme |

|
ˇ Develop guidelines for the experiment ˇ Develop a questionnaire to use with each measurement set ˇ Develop analytical techniques to assess the captured data ˇ Conduct a pilot study to test the methodology ˇ Revise methodology based on pilot study ˇ Hold workshop at CIE Session to start the worldwide study ˇ Conduct the worldwide study ˇ Analyze results ˇ First draft of Technical Report
Details on Pilot Study
This plan was established in our June 1, 2006 meeting
|
|
Planned route of LED reference source for pilot study. Revised 21 December 2006. |
|
Action |
Time Required in Months |
|
Prepare for pilot study ˇ Design questionnaire ˇ Design guidelines ˇ Select appropriate instrumentation |
4 |
|
Conduct pilot study - perform measurements
|
1 2 |
|
Analyze data |
2 |
|
Further data revision |
1 |
|
Total time |
10 |
|
From |
Estimated Ship Date |
Estimated Arrival |
|
Danny Rich |
Jan 5 |
Jan 9 |
|
Ann McCarthy |
Jan 23 |
Jan 25 |
|
Eric Zeisse |
Feb 15 |
Feb 21 |
|
Yasuki Yamauchi |
March 16 |
March 23 |
|
Phil Green |
April 6 |
April 10 |
|
János Schanda |
|
|