CIE Technical Committee 8-10

Work Programme

 

ˇ Develop guidelines for the experiment

ˇ Develop a questionnaire to use with each measurement set

ˇ Develop analytical techniques to assess the captured data

ˇ Conduct a pilot study to test the methodology

ˇ Revise methodology based on pilot study

ˇ Hold workshop at CIE Session to start the worldwide study

ˇ Conduct the worldwide study

ˇ Analyze results

ˇ First draft of Technical Report

 

 

 

Details on Pilot Study

 

This plan was established in our June 1, 2006 meeting

 

 

Planned route of LED reference source for pilot study.  Revised 21 December 2006.

Action

Time Required in Months

Prepare for pilot study

ˇ Design questionnaire

ˇ Design guidelines

ˇ Select appropriate instrumentation

4

Conduct pilot study
 - contact people

- perform measurements

 

 

1

2

Analyze data

2

Further data revision

1

Total time

10

From

Estimated Ship Date

Estimated Arrival

Danny Rich

Jan 5

Jan  9

Ann McCarthy

Jan 23

Jan 25

Eric Zeisse

Feb 15

Feb 21

Yasuki Yamauchi

March 16

March 23

Phil Green

April 6

April 10

János Schanda